I. FUNCTION
– Take responsibility for deploying design work, supervision of construction, operation standard and troubleshooting related to project electrical system, electrical equipment.
– Testing, commissioning and guiding on manual operation
– Assist Project Manager in professional management, controling during project construction.
II. MISSION
– Implementation of internal working rule:
– Obey the company internal working rule, working time, professional working style/attitude/manner and contribute to business cultures.
– Complying with the code of professional ethics, honesty, decisiveness, carefulness, and a sense of law observance.
Job mission:
– Take part in the negotiations to provide services to new and existing customers; contract negotiations with electrical suppliers;
– Coordinate the communication on technical issues in consultation between inside and outside projects.
– Make schedule progress, coordinate the design, technical proposal and BOQ for new networks, repairs, installations, and connections;
– Technical support to Project Development Department for explaining the technical issue to the Government;
– Technical support to Procurement Department, make project bid packages;
– Supervise the construction of new networks, installations, and connections.
-Technical design coordination with other utilities;
– Manage projects related to high, medium and low voltage together with a project team of design consultants, contractors and the operations team.
Operational:
– Third party contract management (design company, verification company, contractors…)
– In charge of obtaining necessary project permits
– Manage contractual requirements of the different bid packages
– In charge of supervision and commissioning of projects
– Control internal and external project communication
– Finalize as-built dossiers and handover the project to the operations department.
– Build bill of quantity and cost estimation by project, by main work per project.
– Review, evaluate technical documents and give best plan for industrial standard and quality.
– Prepare project schedule and construction progress
– Evaluate tender bidding documents, proposal of selection method
Reporting:
– Report of daily work to Project Manager, to Vice General Director by specified order
– Perform project implementation data report as order
III. WORK COMPLETION CRITERIA
– Deployment of engineering work, supervising every working process step, record fully data, set up tracking document for supervision work;
– Cooperation, supporting with highest responsibility
– Manage documents in scientific, fully, accurately method
IV. REQUIREMENT
– Graduation from university, college in electric power system, electrical equipment, electrical technology or similar.
– Having knowledge of electric technical standards applying in industrial electric field.
– Gained experience in project work, document control; prior to working in FDI enterprise, FDI project
– Communication in English (as required), prior to Korean
– Monitoring/managing/organizing skill; work-in-order skill; independent working, observant skill; quickly, accurately resolving skill
– Mindset of carefully, patiently, logically
V. WORKING REGIME, BENEFIT
– Work place: project jobsite (90%); Hanoi office at Plaschem tower, 562 Nguyen Van Cu, Gia Thuy, Long Bien, Hanoi (10%)
– Working time: 8h ~ 17h00, Monday to Saturday (weekend Sunday)
– Salary negotiable
– Compulsory insurances, 13th month bonus, gift on all national holiday, 12 annual leave days/year, 5 holidays/year + summer holiday, annual health examination, accident insurance 24/24
– Working facility: laptop and others as work requires